Jsa for cable pulling pdf

This path is usually under the floor or in the ceiling. At the 30metre point a steel wire rope may be used to complete the pull provided that at least 2 metres of nonconductive rope is used between the cable pulling. The sample safe work method statement for the pulling of electrical cables is an extract. Guidance notes on job safety analysis for the marine and offshore. Retrieve the adc cable from inside the mirror cell and feed it down through the stack and out of the southeast side with the cable run. Pulling of electrical cable safe work method statementjob safety analysis. Maintenance technician painting job hazard assessment 1 job hazard hazard control trip or fall hazards walkingworking surfaces training for working around uneven, wet and slippery surfaces includes warning to others of slippery surfaces. Cable termination a cut from knife while peeling the cable. When pulling pushing the fish tape and wire into a panel board or through conduit with existing conductors it is strongly recommended that the panel board or conductors be deenergized using. Block ssheave sswivels 51 5 b l o c k s s h e a v e s s w i v l s complete contractor and industrial supplier sling and rigging specialist since 1930 visit us online at. Jsas can be used to educate employees on safe practices prior to utilizing equipment. Apply pulling lubricant compound liberally during the installation. Safe work method statement pulling of cables through conduits. Avoid letting the cable stop part way through the pull.

Jsa cable pulling and laying works autosaved personal. Cable jack shall be repaired if welded joints are already deteriorated. Pulling of electrical cable safe work method statementjob safety analysis cable installation to pvc conduit a pvc electrical conduit is a piping system used for the protection and routing of electrical cables to given articles or items of electrical equipment. Job safety analysis14 for cable laying and pulling scribd. Overhead conductor installation guide general cable. The goal of preparing a jha is for those responsible. The cable tray shall be installed with a 40mm minimum space between the structure and the tray. If possible, utilize twoway communication at both ends of the run, particularly on long runs. Inspect all scaffolding components defects or damage such as cracks, excessive rust, metal fatigue, unauthorized repairs, bent tubing. Job safety analysis14 for cable laying and pulling free download as word doc.

Risk assessment cable pulling laying, glanding and termination. A common task on site is the installation of electrical cables in cable tray. Jsas are used to describe how to perform a task stepbystep, any hazards associated with a task, and controls to mitigate these hazards. Cable pulling cable laying cable rollers cable socks. A guideline for laying of cables and installation of sleeves. Excessive lifting, twisting, pushing, pulling, reaching, or bending exposure inhaling, swallowing, or absorbing to harmful levels of gases, vapors, aerosols, liquids, fumes, or dust exposure to excessive light welding falling pulling at one end of the run and feeding at the other. Job safety analysis jsa templates ehs standard operating. Submit finished cable tests manufacturers certified test reports showing compliance with icea s68516, part 3, and ul 1072 for physical requirements of the armor and all aeic final tests, including xy plots of corona discharge for the actual cable furnished. Jsabuilder sample library 4 short electric arc welding 2 of 4. Cut or puncture to skin by cables springs sharps from pulling material. Safe work practices on high voltage cables revision no.

Method statement risk assessment scottish government. Jsabuilder sample library 4 short joboperation title. A steel cable or synthetic rope, called a pulling line, is strung from the puller through each stringing block between the puller and bullwheel tensioner. The third stage consists of pulling the pipeline back into the enlarged hole. Potential hazards and controls are all linked to the job steps. Pilot hole directional drilling pilot hole directional control is achieved by using a nonrotating drill string with an asymmetrical. Alternatively, you can customize the following chemicalspecific sops to match your. A jsa template or a job safety analysis template, a device for studying perceptions that are beneficial and safe in a workplace, can assist in ensuring that. Job safety analysis jsa is a risk assessment technique used to eliminate or reduce the. For telecommunications cables we recommend conductor pulling with a cable pulling head. At csuci our intent and standard practice will be to avoid energized electrical work.

Dalam melakukan pulling cable, diperlukan persiapan dan prosedur yang benar agar tidak terjadi hal yang tidak diinginkan seperti kerusakan kabel dan kecelakaan kerja. A pulling grip may be field installed provided panduit best practices documents are followed. Cable preparation and pulling procedure best practices for. To minimize a tripping hazard, keep adc cable out of the working path as much as possible. Electrical employees run or pull wire throughout a worksite. Other installations, such as buried and aerial, have different installation parameters. Anytime an overhead lift is made, workers must perform a jsa. Large and awkward cable tray or ladder rack to be handledcarried by two. Gently pull and wiggle stuck items to evaluate if they might need to be taken out a different way.

Sp0405r01 field test lv underground cable installations jsa. This pdf is stored securely in the gocanvas cloud and is easily shared. Jha on cable laying and termination safety for all. Pull grip ical suppor tructions for i ultifiber tight ctorized. Jseasy builds your sitespecific job safety analysis jsa for electrical work by adding templates of the steps you are going to take, in the order in which you are going to take them. The combination of the rope eye knot and proper cable grip device, along with an approved and rated shackle, make for a typical ideal condition. Anybody can find occupations and duties, especially individuals utilizing labor thats manual or taking up mechanicalrelated gear, which requires a method based off of stages that. Rope is a very critical link in the cable pulling system. Ask for help when lifting heavy items more than 50 lbs. Job safety analysis jsa library environment, health and. The end of the pulling line is then attached to the conductor end after it has been threaded through the. To assess the exposure to overhead work, it is necessary to observe a worker pulling wire through conduits on construction sites. Method statement for installation of cable tray or trunking. Job safety analysis jsa library job safety analysis is a safety tool which can be used by uncchapel hill supervisors and employees to increase the knowledge of hazards in the workplace at their specific work unit that poses a risk of causing injuries and accidents.

Submit pulling calculations and plan for each mediumvoltage cable. The electrical pulling job safety analysis jsa form mobile app provides consistent documentation for your business. Low voltage cable continuity, insulation resistances and phasing form. Jhas are to be prepared by the supervisor or group manager in charge of the work, with work group member participation. Job hazard analysis jha 4m cass cage electronics and cable installation page 1 of 7 jha preparation instructions. Power cable installation guide cables installed into conduits or trays have installation parameters such as maximum pulling tensions, sidewall pressure, clearance, and jamming, which must be considered. Back strain, cuts, high pulling tension recoil, carrying wire on shoulders, provide nolube lowfriction wire. Electrical pulling job safety analysis jsa form form mobile. Is a rig based tool for measuring the effectiveness of the jsa process so continuous improvement can be achieved. Cardiff road, barry, south glamorgan, cf63 2yl client.

The fastening of the pulling rope to the cable must be undertaken with care to avoid losing the cable on the way. Back care chapter in ihsas construction health and safety manual m029. This job hazard analysis encompasses a wide range of work activities common to most all fbp locations across the ports site. Guidance notes on job safety analysis for the marine and. While incidents related to pulling cable are rare, there are hazards associated with the activity that. This document supports the power system safety rules and its requirements assembled under high voltage transmission cables category 7. Exa cable specific load rating of installation o fety glasses tal injury is s chemicals an fiber are very f the eye easi ing proce on multifi best t. Options to use cable pulling machines in equipment room. Knowledge of materials, heat treatment, and welding procedures is necessary for proper welding. Excessive lifting, twisting, pushing, pulling, reaching, or bending exposure inhaling, swallowing, or absorbing to harmful levels of gases, vapors, aerosols, liquids, fumes, or.

The second stage involves enlarging this pilot hole to a diameter suitable for installation of the pipeline. The safest way to conduct electrical work is to shut off electric power and work on deenergized equipment. The rope, on the other hand, requires a perfect eye knot. This involves pulling at one end of the run and feeding at the other. Signal persons shall be provided during cable laying pulling and shall be equipped with red and green signal flags. Fsutil151 page 1 job safety analysis safety information for the university of california, berkeley facilities services installation, alteration, maintenance, or repair of highlow voltage breakers. Coordinate and communicate when pulling wear gloves keep hands back from conduit entrance. The intent of these guidance notes is to lay out a job safety analysis. Address 501 westwood plaza, 4th floor box 951605 mail code. All cable shall be securely fixed to the tray, work and the complete installation must be carried out in a neat and workmanlike manner without crossovers. Job safety analysis jsa is a risk assessment technique used to eliminate or reduce the occurrence of undesirable incidents during work tasks. Job safety analysis templates 4 free forms for word and pdf.

Electrical pulling job safety analysis jsa form form. The pulling eye may be factory installed by the cable manufacturer. Fsutil151 page 1 job safety analysis safety information for the university of california, berkeley facilities services installation, alteration, maintenance, or repair of highlow voltage breakers notify personnel using the circuits to be interrupted in order to avoid potential injuries or interruption of research projects. Cables on faceup horizontally fixed tray must be secured by use of the tie wraps where not in.

Material pulling out and hitting worker in the face. Print the safe work method statement, swms or jsa sign off sheet and approval form including change management approval in a pdf format or hardcopy via the print option. Coil up, secure andor run cable up and over doors to get off of the floor and out of the way. Jsa cable pulling and laying works autosaved free download as word doc. Steps 11 12 x na x steps 11 12 have been removed to keep this sample to. At both cable ends, its recommended to leave a few meters of cable for reserve. Review the jsa based on the score card requirements and assign a score. Cable drums should be properly located on cable jack designed for the purpose and of suitable capacity and base. Wire is pulled through chases, conduit, or knockouts to get from the electrical supply to the final destination. Accelerate slowly and smoothly to a constant pulling speed.

1486 289 645 121 890 1300 427 427 1366 382 961 1038 1483 342 717 1169 873 4 776 1244 737 982 1291 191 1421 838 205 951 240 818 275 455 1451 1092 1311 598 723